Connect with us

Technology

Portland General Electric’s new wind farm contributes to record-high wind generation for Oregon customers

Published

on

The Clearwater Wind Energy Center helped PGE generate more than one gigawatt of power
from wind sources alone for the first time in company history

PORTLAND, Ore., Nov. 13, 2024 /PRNewswire/ — In its first ten months serving PGE customers, the Clearwater Wind Energy Center contributed to new records for PGE wind generation, including helping the company produce one gigawatt of power from wind sources alone – a new milestone. One gigawatt (or 1,000 megawatts) is enough electricity to power the equivalent of 830,000 homes, or about half the number of homes in Oregon.

The Clearwater Wind Energy Center, located in Rosebud, Custer, and Garfield counties in Eastern Montana, was developed in four phases by a subsidiary of NextEra Energy Resources, LLC, which operates and owns part of the facility. PGE owns 208 megawatts of the center and purchases an additional 103 megawatts through a Power Purchase Agreement, supplying customers a total of 311 megawatts.

The portions of the facility serving PGE customers achieved commercial operations by January 2024 and take advantage of consistent winds from the vast plains of the Treasure State. Alongside other renewable energy projects in the Pacific Northwest, the Clearwater Wind Energy Center adds diversity and consistency to PGE’s energy portfolio, allowing the company to source power for customers when it’s available from a variety of resource types and locations.

With Montana’s abundant and consistent wind, the Clearwater Wind Energy Center delivers high levels of production during the winter and summer, allowing PGE to serve Oregon customers additional reliable clean energy during periods of high demand. In January 2024, PGE’s owned and contracted wind facilities produced a maximum output of more than one gigawatt of wind power for the first time, thanks in large part to the addition of the Clearwater Wind Energy Center. This milestone was achieved again on another 25 days throughout 2024, including on February 26, when PGE reached its all-time record for maximum wind generation at 1,056 megawatts. In addition to the Clearwater Wind Energy Center, which consistently contributes about 34% of PGE’s daily wind generation, PGE also operates wind facilities in the Columbia River Gorge. 

The Clearwater Wind Energy Center was selected through PGE’s 2021 Request for Proposal, a competitive bidding process through which the company solicits proposals for electricity generation facilities that bring value to customers.  

“In just a few short years, we were able to take the Clearwater Wind Energy Center from a proposal on paper to the efficient, productive facility it is today,” said Maria Pope, PGE President and CEO, at an event in September celebrating the commissioning of the facility. “This plant is an example of how working together, we can act quickly to solve some of the biggest challenges facing the energy industry.”

The emissions-free power generated at the facility is delivered to PGE customers through existing transmission lines on Northwestern and Bonneville Power Administration’s system, as well as an approximately 100-mile generation-tie line connecting to the Colstrip substation. The wind center’s addition to PGE’s generation portfolio also reduces the need to purchase potentially costly or greenhouse gas-emitting resources from the open energy market, and takes advantage of federal Production Tax Credits available to renewable energy projects.

“The Clearwater Wind Energy Center is an important component of the future of the Western clean energy landscape,” said Maria Pope. “Sourcing energy from diverse geographies improves reliability at lower costs for customers.”

During each phase of construction, the Clearwater Wind Energy Center created up to 350 jobs and continues to employ operations workers onsite, while generating revenue for the local community. Wind power continues to be an important piece of PGE’s portfolio as the company works to decarbonize while providing reliable, affordable electricity to customers.

View or download b-roll, photos, and videos of the Clearwater Wind Energy Center.

About Portland General Electric Company: 

Portland General Electric (NYSE: POR) is an integrated energy company that generates, transmits and distributes electricity to over 930,000 customers serving an area of 1.9 million Oregonians. For more than 130 years, Portland General Electric (PGE) has powered social progress delivering safe, affordable, reliable and increasingly clean electricity while working to transform energy systems to meet evolving customer needs. PGE has the largest voluntary renewable energy program in the country and was ranked the No. 1 utility in the 2024 Forrester U.S. Customer Experience Index. PGE is committed to reducing emissions from its retail power supply by 80% by 2030 and 100% by 2040. PGE is recognized by the Bloomberg Gender-Equality Index for the company’s commitment to creating a more equal, inclusive workplace. In 2023, PGE employees, retirees and the PGE Foundation donated nearly $4.6 million and volunteered over 23,000 volunteer hours to more than 400 nonprofit organizations. For more information: portlandgeneral.com/news

Safe Harbor Statement

Statements in this news release that relate to future plans, objectives, expectations, performance, events and the like may constitute “forward-looking statements” within the meaning of the Private Securities Litigation Reform Act of 1995, Section 27A of the Securities Act of 1933, as amended, and Section 21E of the Securities Exchange Act of 1934, as amended. Forward-looking statements include statements regarding the company’s future energy mix; statements concerning the company’s integration of smart-grid technologies and renewable energy into the grid; statements regarding acquisition, construction, completion, and operation of generating and battery storage facilities; as well as other statements containing words such as “anticipates,” “believes,” “intends,” “estimates,” “promises,” “expects,” “should,” “conditioned upon,” “will,” “would,” “could” and similar expressions. Investors are cautioned that any such forward-looking statements are subject to risks and uncertainties, including construction and operational risks relating to the generation and battery storage facilities, including wind conditions and unscheduled delays or plant outages, which may result in unanticipated operating, maintenance and repair costs, as well as replacement power costs; the costs of compliance with environmental laws and regulations, including changes in weather, hydroelectric and energy markets conditions, which could affect the availability and cost of purchased power and fuel; changes in capital market conditions, which could affect the availability and cost of capital and result in delay or cancellation of capital projects; failure to complete capital projects on schedule or within budget, failure of the counterparty to perform under the agreements, or the abandonment of capital projects, which could result in the company’s inability to recover project costs; the outcome of various legal and regulatory proceedings; and general economic and financial market conditions. As a result, actual results may differ materially from those projected in the forward-looking statements. All forward-looking statements included in this news release are based on information available to the company on the date hereof and such statements speak only as of the date hereof. The company assumes no obligation to update any such forward-looking statement. Prospective investors should also review the risks and uncertainties listed in the company’s most recent annual report on form 10-K and the company’s reports on forms 8-K and 10-Q filed with the United States Securities and Exchange Commission, including management’s discussion and analysis of financial condition and results of operations and the risks described therein from time to time.

Contact Info:
PGE Communications, PGECommunications@pgn.com; 503-464-2067

Source: Portland General Company

View original content to download multimedia:https://www.prnewswire.com/news-releases/portland-general-electrics-new-wind-farm-contributes-to-record-high-wind-generation-for-oregon-customers-302303570.html

SOURCE Portland General Company

Continue Reading

Technology

State Grid Changzhou Power Supply Company Completes Integrated Automation Renovation of the Main Transformer at the 110 kV Wulian Substation

Published

on

By

CHANGZHOU, China, Nov. 23, 2026 /PRNewswire/ — Recently, the No. 1 main transformer at the 110 kV Wulian Substation of State Grid Changzhou Power Supply Company successfully completed startup and energization after its integrated automation renovation (hereinafter referred to as the “IA renovation”), marking the completion of a key milestone in the Wulian Substation IA renovation project.

It is reported that the 110 kV Wulian Substation is an important power hub in the Jintan area of Changzhou. Its original monitoring and control system has been in operation for a long time, with aging equipment, a relatively high failure rate, difficult maintenance, and insufficient reliability of secondary equipment, which has affected the normal operation of the substation to some extent. The IA renovation aims to improve the performance and operational reliability of the substation’s monitoring and control system, protection devices, and integrated power supply system, improve the substation’s health level, enhance its degree of automation, and strengthen operational safety.

During the implementation of the IA renovation project, State Grid Changzhou Power Supply Company advanced various tasks in the order of “equipment replacement—function verification—signal checking—ledger improvement—closed-loop problem resolution.” On site, protection and measurement-control devices and secondary panels were replaced. On this basis, functional acceptance was carried out for the newly installed protection and measurement-control devices, the device status and “three remote” functions were checked, background computer screen information was checked item by item, and the five-prevention interlocking logic of primary equipment after renovation, as well as the functions of handles, pressure plates, and air switches, were verified. At the same time, detailed problems found during acceptance were promptly resolved item by item with professional personnel and equipment manufacturers; closed-loop rectification of historically inherited defects was urged to ensure that the equipment met commissioning conditions.

At present, the Wulian Substation IA renovation has entered the latter half. In the follow-up, in conjunction with outage plans, the company will continue to cooperate with the construction unit in carrying out renovation of the remaining bays, solidly perform equipment acceptance and pre-commissioning verification, strictly guard the project quality gate, and ensure that all renovation links are connected in an orderly manner and advanced steadily.

After the project is put into operation, it will help solve problems such as aging equipment failing to meet operational requirements and the need to improve major technical parameter levels due to the development of smart grids. It will reduce equipment maintenance and operating costs, improve the operating conditions of secondary equipment, enhance the safety, reliability, and economy of the power grid, and lay a solid foundation for the optimization, upgrading, and safe and stable operation of the local power grid system.

View original content:https://www.prnewswire.com/apac/news-releases/state-grid-changzhou-power-supply-company-completes-integrated-automation-renovation-of-the-main-transformer-at-the-110-kv-wulian-substation-302948027.html

SOURCE State Grid Changzhou Power Supply Company

Continue Reading

Technology

New Survey Uncovers an “Aloneware” Crisis: Isolated AI Development Threatens Enterprise Stability and Adds Maintenance Costs

Published

on

By

More than half of UK AI decision-makers and IT leaders say standalone coding assistants lead to “aloneware”: software that’s difficult to support, understand, and maintain

LONDON, Nov. 23, 2026 /PRNewswire/ — Appian (Nasdaq: APPN), an AI automation leader, today released new research asking UK AI decision-makers and IT leaders about AI-assisted development. They found that enterprise investments in fast-tracked AI software development are creating an unexpected drain on corporate innovation capital, with 79% of UK enterprise leaders allocating at least 10% of their current technology innovation funds to test, deploy, maintain, update, integrate and/or repair isolated AI software builds.

In the survey of 200 UK respondents at large enterprises, Appian defines a new term: “aloneware.” These are applications built or modified with AI-assisted development tools outside an approved enterprise platform environment. While these tools accelerate initial code creation, organisations face mounting friction to understand AI-generated applications and keep them functional, secure, and integrated over time.

Upfront speed creates downstream work

Initial build speed is failing to deliver long-term efficiency. Almost two-thirds (64%) of enterprise leaders surveyed report that while standalone AI tools accelerate development, they are spending more time across testing, system integration, troubleshooting, scaling, and/or deployment.

According to Matt Calkins, CEO of Appian, “Some people get so excited about ‘free’ software that they forget the risks. Enterprises can now create tech debt faster than ever before.”

Aloneware diverts strategic innovation budgets

The operational burden of maintaining software built outside a platform is directly diverting capital away from strategic growth. Almost eight in 10 (79%) enterprise leaders surveyed report allocating at least 10% of their current technology innovation budgets to testing, deploying, maintaining, updating, integrating and/or repairing software built outside a platform environment. And 43% of those surveyed currently allocate at least 20% of the budget—a figure that 55% expect to allocate within the next two years, indicating that the financial drain is accelerating quickly.

Compounding these budget demands, 60% of UK enterprise leaders report unexpected post-launch costs or resources tied directly to security, governance, and compliance remediation.

The support void and the need for platforms

When isolated AI applications break, organisations face a critical support void. 60% of leaders find it challenging to access accountable technical support when problems arise with applications built outside a platform, while 61% report difficulties keeping code, architecture, dependencies, and system integrations up to date.

Against this backdrop, 59% of respondents state that a shared architectural foundation would improve their ability to control total cost of ownership and 60% say it would help them maintain software over time.

“The most important applications in enterprises need support,” Calkins adds. “If you vibe-code them, there will be nobody to turn to when problems occur. Using AI to build applications on a commercial platform combines the speed of AI with the reliability of supported technology.”

To access the complete research findings and executive report, visit appian.com/aloneware.

About the research

The research was conducted by Censuswide among 200 senior decision-makers who primarily work in AI/Engineering or IT, work at large enterprises (5,000 employees or more, or annual revenue exceeding $1 billion), and who work on at least three software systems annually. Respondents were based in the UK. Data was collected between 21 and 30 October 2026.

Censuswide is a member of the Market Research Society (MRS) and the British Polling Council (BPC), and a signatory of the Global Data Quality Pledge. The research adheres to the MRS Code of Conduct and ESOMAR principles.

About Appian

Appian provides AI automation for the most important business processes at the world’s largest organisations.  

On the Appian Platform, customers build AI-powered processes that accelerate work, reduce cost, and manage risk. Our platform is known for its unique power, reliability, and scale. We’ve been automating processes for more than 25 years and have proven expertise in enterprise operations. For more information, visit appian.com. [Nasdaq: APPN]

Follow Appian: LinkedIn, YouTube, Instagram, Facebook, and X.

 

View original content to download multimedia:https://www.prnewswire.com/news-releases/new-survey-uncovers-an-aloneware-crisis-isolated-ai-development-threatens-enterprise-stability-and-adds-maintenance-costs-302948028.html

SOURCE Appian

Continue Reading

Technology

Share buybacks in Ericsson during the period November 16 – November 20, 2026

Published

on

By

STOCKHOLM, Nov. 23, 2026 /PRNewswire/ — During the period November 16 – November 20, 2026, Telefonaktiebolaget LM Ericsson (publ) (“Ericsson”) (LEI code 549300W9JLPW15XIFM52) repurchased own Class B shares (ISIN: SE0000108656) as follows:

Date

Aggregated daily volume (number of shares)

Weighted average share price per day (SEK)

Total daily transaction value (SEK)

16/11/2026

100,000

106.5100

10,651,000.00

17/11/2026

100,000

105.1818

10,518,180.00

18/11/2026

100,000

105.0654

10,506,540.00

19/11/2026

100,000

104.6379

10,463,790.00

20/11/2026

100,000

102.4982

10,249,820.00

Total

500,000

104.7787

52,389,330.00

The share repurchases are a part of the share buyback program of up to SEK 15,000,000,000 which Ericsson announced on April 16, 2026, and which runs between April 23, 2026, and March 31, 2027, at the latest. The Board of Directors intends to propose to the 2027 Annual General Meeting that the repurchased shares, other than those used to fulfil Ericsson’s obligations under its share-related incentive programs, are cancelled.

The share buyback program is executed in accordance with the Regulation (EU) No 596/2014 of the European Parliament and of the Council on market abuse (MAR) and the Commission Delegated Regulation (EU) 2016/1052 of 8 March 2016 supplementing MAR (the Safe Harbour Regulation).

All acquisitions have been carried out on Nasdaq Stockholm by Goldman Sachs Bank Europe SE on behalf of Ericsson. A full breakdown of the transactions is attached to this announcement.

Following the repurchases above, Ericsson’s holding of treasury stock amounts to 132,415,894 Class B shares. There are in total 3,371,351,735 shares in Ericsson, 261,755,983 shares of Class A and 3,109,595,752 shares of Class B.

NOTES TO EDITORS:

FOLLOW US:

Subscribe to Ericsson press releases
Subscribe to Ericsson blog posts
https://x.com/ericsson
https://www.facebook.com/ericsson
https://www.linkedin.com/company/ericsson

MORE INFORMATION AT:
Ericsson Newsroom
media.relations@ericsson.com  (+46 10 719 69 92)
investor.relations@ericsson.com  (+46 10 719 00 00)

Investors
Daniel Morris, Vice President, Head of Investor Relations
Phone: +44 7386 657217
E-mail: investor.relations@ericsson.com

Lena Häggblom, Director, Investor Relations
Phone: +46 72 593 27 78
E-mail: lena.haggblom@ericsson.com

Media
Ralf Bagner, Head of Media Relations
Phone: +46761284789
E-mail: ralf.bagner@ericsson.com

ABOUT ERICSSON:
Ericsson’s high-performing, programmable networks provide connectivity for billions of people every day. For 150 years, we’ve been pioneers in creating technology for communication. We offer mobile communication and connectivity solutions for service providers and enterprises. Together with our customers and partners, we make the digital world of tomorrow a reality. www.ericsson.com

This information was brought to you by Cision http://news.cision.com

https://news.cision.com/ericsson/r/share-buybacks-in-ericsson-during-the-period-november-16—november-20–2026,c4427608

The following files are available for download:

https://mb.cision.com/Main/15448/4427608/4383821.pdf 

Share buybacks in Ericsson during the period November 16-November 20 2026

https://mb.cision.com/Public/15448/4427608/923f499b6f383962.xlsx 

Daily Ericsson Share Buyback Report

View original content:https://www.prnewswire.com/news-releases/share-buybacks-in-ericsson-during-the-period-november-16–november-20-2026-302948030.html

SOURCE Ericsson

Continue Reading

Trending