Connect with us

Technology

Huawei Reveals a Next-Generation Site Power Facility Architecture and AI Data Center Construction Guideline

Published

on

BARCELONA, Spain, March 5, 2025 /PRNewswire/ — At the Product & Solution Launch during MWC Barcelona 2025, He Bo, President of Huawei Data Center Facility & Critical Power Product Line, unveiled the next-generation site power facility architecture “Single SitePower” and the AI data center construction guideline RASTM, helping operators thrive as energy prosumers and build better ICT facilities in the new era of AI.

“The rise of network architectures centered on data centers in the intelligent era is driving higher demands for digital and intelligent energy.” According to He Bo, Huawei Digital Power is making continuous innovations in architectures and solutions to help operators thrive as energy prosumers.

Single SitePower: Next-Generation Intelligent Architecture for Site Power Facilities

Single SitePower is a next-generation intelligent solution architecture for site power facilities. It adopts a unique three-level synergy mechanism covering site power facilities, wireless networks, and power grids to implement bidirectional interaction of power and information flows in the end-to-end process from the power source, grid, and load to storage. The architecture supports full-link sensing, visualization, and management, improving site energy efficiency (SEE) and power availability (PAV) while reducing the network carbon intensity energy (NCIe). The architecture offers three distinct features:

Resilient: Huawei integrates wireless networks and site power facility networks to implement grid-source synergy, source-storage synergy, and storage-load synergy, and build resilient facilities throughout the process.

Green: Cutting-edge technologies such as high-voltage series connection, optimizers, intelligent algorithms, and arc fault circuit interrupters (AFCIs), and rapid shutdown devices (RSDs) can be used to build green sites and accelerate the value monetization of green energy.

Reliable: Huawei believes that high-quality and safe lithium batteries should be the top consideration to ensure reliable communication.

RASTM: AI Data Center Construction Guideline

From general-purpose computing to AI computing, data centers need to resolve four major challenges: reliability, uncertainty, rapid delivery, and high power demand. Through joint innovation with global customers, Huawei proposes the AI data center construction guideline RASTM:

Reliable: As the value of AI facilities increases sharply, reliability becomes a major challenge. AI data centers should adopt an enhanced architecture, products, intelligent management, and professional services to ensure reliability throughout their lifecycle.

Agile: AI data centers should be agile and adopt modular design and electromechanical decoupling to flexibly address uncertain requirements and enable rapid delivery.

Sustainable: Power supply efficiency will be a major concern for data centers. The focus of energy efficiency improvement will shift from the efficiency of individual equipment to the efficiency of a parallel system, and then to the large-scale application of the super economic control operation (S-ECO) mode.

“We advocate the concept of Power for AI & AI for Power and will invest continuously in technological innovation to promote the deeper integration of digital, intelligent, and low-carbon technologies, and build resilient, green, and reliable ICT facilities, helping operators transform from energy consumers to prosumers,” said He Bo.

MWC Barcelona 2025 is held from March 3 to March 6 in Barcelona, Spain. During the event, Huawei will showcase its latest products and solutions at stand 1H50 in Fira Gran Via Hall 1. In 2025, commercial 5G-Advanced deployment will accelerate, and AI will help carriers reshape business, infrastructure, and O&M. Huawei is actively working with carriers and partners around the world to accelerate the transition towards an intelligent world.

For more information, please visit: http://carrier-back.huawei.com/en/events/mwc2025 

Photo – https://mma.prnewswire.com/media/2634280/image_5015379_24658563.jpg

View original content:https://www.prnewswire.co.uk/news-releases/huawei-reveals-a-next-generation-site-power-facility-architecture-and-ai-data-center-construction-guideline-302392988.html

Continue Reading

Technology

HR Path Strengthens its Australian Presence with Strategic Acquisition of Payroll Experts Australia

Published

on

By

PARIS, Oct. 21, 2026 /PRNewswire/ — HR Path, a global leader in HR consulting and HRIS solutions, today announces its strategic acquisition of Payroll Experts Australia, a Brisbane-based company specialising in payroll compliance, remediation, workforce management and HR systems consulting.

Founded in 2009, Payroll Experts Australia has delivered more than 530 projects for over 260 organisations across Australia and New Zealand. Independent of any software vendor, the company supports employers across the full payroll, workforce management and HR systems lifecycle, with expertise spanning payroll compliance and audit, remediation, award and agreement interpretation, payroll processing, advisory and end-to-end systems implementation.

The acquisition strengthens HR Path’s ability to provide end-to-end HR transformation services across the ANZ market. Payroll Experts Australia’s specialist capabilities complement HR Path’s existing HRIS technology and SAP SuccessFactors expertise, enabling the combined organisation to support clients with a broader range of locally grounded services, from strategic advisory and systems implementation to payroll compliance and operational support. 

Payroll Experts Australia will continue to operate under the brand “Payroll Experts Australia, an HR Path Company”. Its leadership team and employees will remain in their current roles, ensuring continuity of service for clients while giving the business access to HR Path’s international capabilities and resources. 

The transaction builds on HR Path’s expansion in the region. HR Path has been active in Australia since 2019, following the acquisition of DDG. It opened an Australian office in 2024 and acquired RKM Consulting in 2025, strengthening its HRIS technology and SAP SuccessFactors capabilities across Australia and New Zealand.  

“The acquisition of Payroll Experts Australia, a company renowned for its expertise in payroll compliance, is a strategic move that supports our ambition to be the global reference in HR transformation,” said François Boulet, Co-founding Partner at HR Path. “Their deep knowledge and strong client relationships in Australia complement our global capabilities, enabling us to deliver even more value to our clients. This partnership is about synergy, innovation, and shared commitment to excellence.”

“We are very happy about this new chapter!” said Steve Keenaghan, Chief Executive Officer at Payroll Experts Australia. “This step opens up exciting opportunities for our team and our clients and ensures our continued growth and success. We will maintain our commitment to delivering exceptional, independent payroll expertise while exploring new possibilities within HR Path.”

Contact:

Fabienne LATOUR  Fabienne.latour@hr-path.com

 

 

View original content to download multimedia:https://www.prnewswire.co.uk/news-releases/hr-path-strengthens-its-australian-presence-with-strategic-acquisition-of-payroll-experts-australia-302915164.html

Continue Reading

Technology

Sungrow Powers Up for All Energy Australia 2026 With New Residential Innovation and Full Ecosystem Showcase

Published

on

By

MELBOURNE, Australia, Oct. 21, 2026 /PRNewswire/ — Sungrow, the global leader in PV inverter and energy storage solutions, is set to make a strong return to All Energy Australia 2026, the region’s largest and most influential renewable energy exhibition. It will introduce its next-generation all-in-one residential flagship PowerHarbour, alongside a comprehensive showcase of technologies for residential, C&I, and utility-scale applications.

As Australia accelerates toward a cleaner, more resilient energy future, Sungrow’s presence at All Energy will once again serve as a central meeting point for industry leaders, installers, innovators, and policymakers. The booth will offer visitors a rich blend of product demonstrations, technical insights, interactive experiences, and opportunities to connect with Sungrow’s local engineering and sales teams.

A New Addition to Residential Energy Storage

At the upcoming All-Energy 2026, Sungrow will officially unveil PowerHarbour in Australia for the first time. It is a residential all in one solution designed to simplify energy independence for homeowners. It combines sleek design, intelligent integration, advanced safety features and a modular design that can deliver up to 120kWh of capacity. The enhanced AFCI 3.0 protection makes it one of the most flexible and homeowner‑friendly systems on the market. The result is a clean, integrated solution that empowers households to take control of their energy with confidence and ease.

C&I Solutions for Diverse Applications

The exhibition will also showcase Sungrow’s C&I portfolio, including PowerKeeper, deployed across diverse Australian environments, and the ST255CS liquid-cooled BESS cabinet, designed for applications such as microgrid stability and FCAS. Together, these solutions demonstrate Sungrow’s capabilities in delivering flexible, reliable energy storage for a wide range of commercial and industrial needs.

Utility-Scale Innovation on Display

For utility developers and EPCs, Sungrow will present a full-size PowerTitan 3.0, giving visitors a rare opportunity to see the battery container up close. Together, PowerTitan 3.0 and 1+X modular inverter demonstrate advanced energy storage, grid-forming capabilities, and flexible deployment for complex project environment. Backed by dedicated local project management, comprehensive technical support, and a growing project pipeline across Australia and New Zealand.

Visit Sungrow at Booth KK123

Sungrow invites all attendees to visit Booth KK123 at All Energy Australia 2026 to experience its latest residential, commercial, and utility‑scale innovations firsthand. Attendees can expect a vibrant and engaging atmosphere throughout the day featuring lucky draws with exciting prizes, free premium coffee, photobooth and insightful presentations. The booth promises a full day of discovery, connection, and inspiration. Sungrow looks forward to welcoming partners, customers, and renewable energy enthusiasts as we continue powering Australia’s clean energy future together.

View original content to download multimedia:https://www.prnewswire.com/apac/news-releases/sungrow-powers-up-for-all-energy-australia-2026-with-new-residential-innovation-and-full-ecosystem-showcase-302915169.html

SOURCE Sungrow

Continue Reading

Technology

AglaiaSense and Leopard Imaging to Demonstrate Privacy-First AI Traffic Sensing at Smart City Expo World Congress in Barcelona

Published

on

By

FREMONT, Calif. and BARCELONA, Spain, Oct. 21, 2026 /PRNewswire/ — AglaiaSense and Leopard Imaging will exhibit together at Smart City Expo World Congress, November 3–5, 2026, at Fira Barcelona Gran Vía.

The two companies proposed AI-VIVA (Vision Intelligence for València and Arterials) and is selected as a finalist in the fifth urban challenge of Barcelona Innova Lab Mobility (BILM), on the application of artificial intelligence to traffic-light regulation. AI-VIVA combines AglaiaSense’s edge-AI traffic solutions with Leopard Imaging’s patented privacy architecture. At the show, the team will give a live demonstration of AglaiaSense’s signature MS500 and GS500 cameras, with the AglaiaSense AI Box, powered by NVIDIA, which adds local processing to coordinate groups of neighboring intersections.

The cameras analyze images inside the device, using the Sony IMX500 and IMX501 intelligent vision sensors. They count and classify vehicles, buses, cyclists and pedestrians in real time. Raw video is discarded on the device within 400–800 milliseconds, and only anonymous metadata is transmitted. Cities can feed that data into signal-control software to adapt traffic lights to real demand.

MS500: about 2 W average power, 1080p, powered from a standard NEMA or ZHAGA street-light socket.

GS500: about 6.5 W average, dual 4K cameras, with Ethernet, LTE Cat 4 and GPS; powered by PoE, 12–24 V DC or a NEMA adapter.

Both cameras: IP66-rated, −20 °C to +65 °C, mounted on existing poles, so no trenching or new masts are needed.

Bandwidth: more than 95% lower than CCTV-based monitoring.

“Cities want safer, smoother streets without turning every crossing into a surveillance point,” said Leon Luo, CEO of AglaiaSense. “Being named a finalist in Barcelona tells us the approach resonates.”

“Privacy has to be built into the camera, not added later,” said Bill Pu, CEO of Leopard Imaging.

AglaiaSense’s solutions are deployed across North America and Asia, and the company won first place in the Pedestrian Safety Challenge Hackathon, run by the Edge AI Foundation (formerly the tinyML Foundation) and the City of San José. In field tests, the systems achieved detection and counting accuracy above 95%. The City of Lakewood, Colorado, compared the GS500 with traditional IP cameras and LiDAR on real roads and found it more accurate, more energy-efficient, and less costly to deploy. At a high-risk crossing where pedestrians often crossed outside the crosswalk, the system alerted approaching drivers in real time.

Visit us at Pavilion 3, Level 0, Street D, Stand 71. To book a meeting, email sales@aglaiasense.com.

About AglaiaSense

AglaiaSense, is an edge-AI company specializing in privacy-first, vision-based sensing for smart cities. Its GS500 and MS500 cameras run AI on the image sensor to count and classify road users in real time and send only anonymous metadata.

About Leopard Imaging

Leopard Imaging is a global leader in high-definition embedded cameras and AI-based imaging solutions in industries including automotive, aerospace, drones, IoT, and robotics.

Media contact:

Cathy Zhao

+1 (408) 263-0988

View original content to download multimedia:https://www.prnewswire.co.uk/news-releases/aglaiasense-and-leopard-imaging-to-demonstrate-privacy-first-ai-traffic-sensing-at-smart-city-expo-world-congress-in-barcelona-302914775.html

Continue Reading

Trending