Connect with us

Technology

Canaan Inc. Provides July 2026 Bitcoin Production and Mining Operation Updates

Published

on

SINGAPORE, Aug. 17, 2026 /PRNewswire/ — Canaan Inc. (NASDAQ: CAN) (“Canaan” or the “Company”), an innovator in compute and energy infrastructure, today released its unaudited bitcoin mining update for the month ending July 31, 2026.

Management Commentary

“July was a month of continued operational discipline as we navigated a dynamic mining environment,” said Nangeng Zhang, chairman and chief executive officer of Canaan. “We mined 46 bitcoins during the period, bringing our cryptocurrency treasury to 1,917 BTC and 3,952 ETH at the month-end. Across our mining operations, our North American non-JV fleet maintained an average miner efficiency of 17.9 J/TH. Our joint venture operations continued to stabilize following the wildfire-related disruption at Alborz, with operating hashrate increasing steadily to 4.20 EH/s and installed hashrate reaching 4.85 EH/s at month-end.”

Zhang continued, “More broadly, our recently announced authorization for management to use a portion of our cryptocurrency treasury to fund share repurchases reflects a flexible and selective approach to treasury management. Bitcoin generated through our operations provides us with a strategic source of capital that can be monetized and redeployed when we believe market conditions make share repurchases an attractive use of capital and support long-term value creation on a per-share basis.”

“Looking ahead, we view our mining operations as more than a source of computing capacity. Combined with our disciplined approach to capital allocation, we believe Canaan is positioned to expand beyond computing hardware and to build a more integrated computing and energy platform, while creating additional opportunities to generate long-term value for our shareholders.”

July 2026 Bitcoin Mining Updates (unaudited)

Key Metrics

Results (Rounded Numbers)

Bitcoins Mined During the Month

46 BTC

Month-End Bitcoins and ETH Owned by Canaan
Inc. on Balance Sheet[1]

1,917 BTC

3,952 ETH

Month-End Installed Hashrate (EH/s)

Non-JV: 10.05 EH/s

JV[5]: 4.85 EH/s

Month-End Operating Hashrate (EH/s)[2]

 

Non-JV: 10.05 EH/s

JV[5]: 4.20 EH/s

Month-End Average Revenue Split[3]

60.6% (excluding JV ownership)

Average All-in Power Cost During the Month[4]

US$0.043/kWh

July 2026 Bitcoin Mining Infrastructure Updates (unaudited)

North America

Non-North America

Global

Month-End Average

Miner Efficiency

Non-JV: 17.9 J/TH

JV[5]: 24.8 J/TH

29.3 J/TH

 

Non-JV: 23.7 J/TH

JV[5]: 24.8 J/TH

Month-End Installed

Power Capacity

Non-JV: 88.7 MW

JV[5]: 120 MW

157.5 MW

 

Non-JV: 246.2 MW

JV[5]: 120 MW

Notes:

1. Defined as the total number of bitcoins and ETH owned by the Company on its balance sheet, including any bitcoins and ETH receivable, and excluding bitcoins and ETH received as customer deposits.

2. Defined as the operating hashrate that could theoretically be generated by all energized mining machines as of month-end, including machines that may be temporarily offline, and applies only to non-JV operations. 

3. Defined as the weighted average percentage that Canaan would receive from the total revenues generated according to the applicable joint mining arrangements if 100% of the mining machines consisting of Installed Computing Power (as defined below) were energized.

4. Defined as the weighted average cost of power if 100% of the mining machines consisting of Installed Computing Power were energized.

5. “JV” represents the Company’s 49% stake in the Alborz, Bear, and Chief Mountain facilities in West Texas. JV metrics are shown separately and are not included in bitcoin production or average all-in power cost calculations.

Current Mining Projects (As of July 31, 2026):

Regions
in alphabetical order
(A to Z)

Active
Mining
Projects
Count

Operating
Computing
Power[6]

Installed
Computing
Power[7]

Expected
Computing
Power[8]

Estimated
Total
Computing
Power[9]

Global

12

14.24 EH/s

14.89 EH/s

0.10 EH/s

14.99 EH/s

America

4

4.90 EH/s

4.90 EH/s

0.00 EH/s

4.90 EH/s

JV-WindHQ

3

4.20 EH/s

4.85 EH/s

0.00 EH/s

4.85 EH/s

Canada

1

0.06 EH/s

0.06 EH/s

0.10 EH/s

0.16 EH/s

Ethiopia[10]

2

4.96 EH/s

4.96 EH/s

0.00 EH/s

4.96 EH/s

Middle East

1

0.04 EH/s

0.04 EH/s

0.00 EH/s

0.04 EH/s

Malaysia

1

0.08 EH/s

0.08 EH/s

0.00 EH/s

0.08 EH/s

Notes:

6. Defined as the amount of computing power that could theoretically be generated if all mining machines that have been energized were currently in operation, including mining machines that may be temporarily offline, and applies only to non-JV operations. 

7. Defined as the sum of Operating Computing Power and computing power that has been installed but not yet in operation, if any.

8. Defined as the amount of computing power that has been delivered to the country where each mining project is located, but not yet installed. 

9. Defined as the sum of Installed Computing Power and Expected Computing Power.

10. Canaan has paused its mining operations in Ethiopia, but its hashrate remains part of the Company’s installed hashrate.

Recent Corporate Updates:

Authorized Share Repurchase Using Portion of Digital Asset Treasury

On August 4, 2026, the Company announced that it authorized its management to monetize a portion of its digital asset treasury to fund repurchases of its American Depositary Shares (“ADSs”). The repurchases will be executed under the Company’s existing share repurchase program authorized by its board of directors on December 12, 2025. Based on its current market capitalization, the Company is trading below the combined value of its digital asset holdings and cash position as reported on March 31, 2026. Management believes the current market value does not fully reflect the Company’s underlying assets and performance, making the deployment of digital assets for share buybacks an allocation of capital that demonstrates confidence in its long-term prospects and could enhance shareholder value.

Completed Transfer to Nasdaq Capital Market and Received an Additional 180-day Compliance Period

On July 1, 2026, Canaan completed the transfer of the listing of its American Depositary Shares from the Nasdaq Global Market to the Nasdaq Capital Market. The Company also applied for an additional 180-day compliance period to regain compliance with Nasdaq’s minimum bid price requirement while continuing to execute its long-term energy-plus-compute strategy. On July 15, 2026, the Company announced that it received written notification from The Nasdaq Stock Market LLC granting the Company an additional 180-day compliance period, or until January 11, 2027, to regain compliance with Nasdaq’s minimum bid price requirement under Listing Rule 5550(a)(2). The Company satisfies the continued listing requirement for market value of publicly held shares and all other applicable listing requirements for initial listing on the Nasdaq Capital Market, except for the minimum bid price requirement. The notification has no immediate effect on the listing or trading of Canaan’s ADSs, which will continue trading on the Nasdaq Capital Market under the symbol “CAN.” To regain compliance, the closing bid price of the Company’s ADSs must reach at least US$1.00 per ADS for a minimum of ten consecutive business days during this period. Management plans to continue monitoring the closing bid price and evaluating all available options to rectify the deficiency while maintaining its current listing on the Nasdaq Capital Market.

About Canaan Inc.

Established in 2013, Canaan Inc. (NASDAQ: CAN), is a technology company focusing on ASIC high-performance computing chip design, chip research and development, computing equipment production, and software services. Canaan has extensive experience in chip design and streamlined production in the ASIC field. In 2013, Canaan’s founding team shipped to its customers the world’s first batch of mining machines incorporating ASIC technology under the brand name Avalon. In 2019, Canaan completed its initial public offering on the Nasdaq Global Market. To learn more about Canaan, please visit https://www.canaan.io/.

Safe Harbor Statement

This press release contains forward-looking statements. These statements are made under the “safe harbor” provisions of the U.S. Private Securities Litigation Reform Act of 1995. These forward-looking statements can be identified by terminology such as “will,” “expects,” “anticipates,” “future,” “intends,” “plans,” “believes,” “estimates” and similar statements. Among other things, the business outlook and quotations from management in this announcement, as well as Canaan Inc.’s strategic and operational plans, contain forward-looking statements. Canaan Inc. may also make written or oral forward-looking statements in its periodic reports to the U.S. Securities and Exchange Commission (“SEC”) on Forms 20-F and 6-K, in its annual report to shareholders, in press releases and other written materials and in oral statements made by its officers, directors or employees to third parties. Statements that are not historical facts, including statements about Canaan Inc.’s beliefs and expectations, such as expectations with regard to revenue or mining hash rate deployment, are forward-looking statements. Forward-looking statements involve inherent risks and uncertainties. A number of factors could cause actual results to differ materially from those contained in any forward-looking statement, including but not limited to the following: the Company’s goals and strategies; the Company’s future business development, the ability of the Company to execute against its goals, financial condition and results of operations; the expected growth of the bitcoin industry and the price of bitcoin; the Company’s expectations regarding demand for and market acceptance of its products, especially its bitcoin mining machines; the Company’s expectations regarding maintaining and strengthening its relationships with production partners and customers; the Company’s investment plans and strategies, fluctuations in the Company’s quarterly operating results; competition in its industry; changing macroeconomic and geopolitical conditions, including evolving international trade policies and the implementation of increased tariffs, import restrictions, and retaliatory trade actions; and relevant government policies and regulations relating to the Company and cryptocurrency. Further information regarding these and other risks is included in the Company’s filings with the SEC. All information provided in this press release and in the attachments is as of the date of this press release, and Canaan Inc. does not undertake any obligation to update any forward-looking statement, except as required under applicable law.

Investor Relations Contact

Canaan Inc.
Xi Zhang
Email: IR@canaan-creative.com

Christensen Advisory
Christian Arnell
Email: canaan@christensencomms.com

Media Contact

BlocksBridge Consulting
Jesse Colzani
Email: canaan@blocksbridge.com

View original content:https://www.prnewswire.com/news-releases/canaan-inc-provides-july-2026-bitcoin-production-and-mining-operation-updates-302852691.html

SOURCE Canaan Inc.

Continue Reading
Click to comment

Leave a Reply

Your email address will not be published. Required fields are marked *

Technology

PCB Bank Launches 2026 Brand Campaign, “To a World of Possibilities – That’s PCBility”

Published

on

By

LOS ANGELES, Aug. 17, 2026 /PRNewswire/ — PCB Bank announced the launch of its new 2026 brand campaign, “To a World of Possibilities – That’s PCBility” celebrating how customers’ ambitions and PCB Bank’s financial expertise come together to create greater opportunities.

The campaign creatively illustrates the synergy between customers’ ambitions and PCB Bank’s financial expertise, showing how that partnership transforms potential into greater achievements while reinforcing the Bank’s commitment to helping individuals and businesses turn possibilities into reality.

First introduced in 2024, PCBility has become PCB Bank’s core brand identity. Building on that foundation, the 2026 campaign culminates with the brand message, “To a World of Possibilities – That’s PCBility,” symbolizing the synergy created when customers’ aspirations are supported by PCB Bank’s financial solutions. Throughout the campaign, PCB Bank’s core strengths—including Tailored Business Financial Services, Speedy Business Banking, and Easy Convenient Online Banking—are naturally woven into stories of customers pursuing growth and success.

A defining creative element of the campaign is its seamless integration of live action and illustration animation. Each commercial begins by portraying customers pursuing meaningful goals in real-life settings before transitioning naturally into illustration animation through the PCB Bank logo, visually bringing to life their aspirations, future achievements, and realized dreams.

“The combination of live action and illustration animation was never simply about introducing a new visual style,” said Karen Park, President of TEN Advertising, PCB Bank’s official advertising partner behind the campaign. “Our goal was to visually capture customers’ dreams and future success, reinforcing the idea that even greater possibilities can unfold when they partner with PCB Bank.”

The campaign further reinforces its message through three creative campaign messages:

For building dreams that grow, A bedrock of financial support – Tailored Business Financial ServicesFor truly tough challenges, Banking, simplified – Speedy Business BankingFor the possibilities of today, Banking of tomorrow – Easy Convenient Online Banking

Together, these campaign messages demonstrate how PCB Bank’s financial solutions support customers through every stage of their personal and business journeys.

“This campaign reflects how our customers’ potential can grow into even greater achievements through PCB Bank’s financial solutions,” said Henry Kim, President and CEO of PCB Bank. “Guided by our brand philosophy, Possibility Elevated, we will continue to be a trusted financial partner, helping our customers build stronger businesses, brighter futures, and greater possibilities.”

The campaign will roll out across television, digital platforms, display advertising, print, and out-of-home media, extending PCB Bank’s message of growth, opportunity, and partnership to a broader audience.

About PCB Bank

PCB Bank is a publicly traded (NASDAQ: PCB) community bank based in Los Angeles, California. Established in 2003 as Pacific City Bank, PCB Bank has provided the financial needs of local businesses and communities with personalized banking solutions and exceptional customer service. Our mission at PCB Bank is to partner with our business clients for success by providing total relationship banking. We commit to fostering local growth and development.
To learn more about PCB Bank, visit www.mypcbbank.com.

View original content to download multimedia:https://www.prnewswire.com/news-releases/pcb-bank-launches-2026-brand-campaign-to-a-world-of-possibilities—thats-pcbility-302852156.html

SOURCE PCB Bank

Continue Reading

Technology

Río Hondo College invests in stronger campus technology support to improve student, faculty and staff experiences

Published

on

By

Partnership with Boldyn Networks strengthens ERP support and internal IT capacity, answers to growing demand for managed application services in higher education

LOS ANGELES, Aug. 17, 2026 /PRNewswire/ — Río Hondo College has selected Boldyn Networks (Boldyn) as a trusted partner to invest in Managed Application and Enterprise Resource Planning (ERP) services, helping expand the capacity of the college’s internal IT team and strengthening support for the critical applications that underpin day-to-day operations.

Boldyn will work with Río Hondo College to assess, support and optimize its application environment, including cloud migration planning, infrastructure hosting management, application management, Software-as-a-Service readiness, database administration, and business continuity and disaster recovery planning.

For Río Hondo College, the partnership provides access to specialists with deep experience supporting higher education institutions without increasing pressure on existing staff resources. The approach enables the college’s IT team to spend more time advancing strategic initiatives that support institutional goals and student success.

Allan Abutin, Interim Executive Director, Information Technology Services, at Río Hondo College, said “Our technology systems play an essential role in supporting every part of the college experience. As the complexity of those systems continues to grow, it becomes increasingly important to have access to the right expertise and resources. Boldyn’s higher education experience and dedicated support model give us confidence that we can continue delivering reliable services while allowing our internal team to focus on the strategic initiatives that drive value for our students, faculty and staff.”

Matt Loecke, SVP Higher Education, at Boldyn Networks US, said “Higher education institutions are navigating significant technology transformation while managing increasing demands on internal IT teams. Río Hondo College has taken a proactive approach by investing in the ERP services and expertise needed to support its long-term goals. We are proud to be selected as a trusted partner and look forward to helping the college maximize the value of its technology environment while delivering reliable experiences for its campus community.”

Boldyn’s Managed Application Services are designed to help colleges and universities reduce the operational burden of supporting increasingly complex application environments while maintaining visibility and control over their technology strategy.

Full press release HERE.

Media Contact: 
media@boldyn.com

View original content to download multimedia:https://www.prnewswire.com/news-releases/rio-hondo-college-invests-in-stronger-campus-technology-support-to-improve-student-faculty-and-staff-experiences-302851951.html

SOURCE Boldyn Networks

Continue Reading

Technology

TruGrid and RE+ Partner on Exclusive Attendee Guide Ahead of RE+ 26

Published

on

By

HOUSTON, Aug. 17, 2026 /PRNewswire/ — As the renewable energy industry prepares for one of its largest annual gatherings, TruGrid has partnered with RE+ to publish an exclusive insider guide designed to help attendees make the most of this year’s conference in Las Vegas.

The blog, RE+ 26 Survival Guide: What Every Attendee Needs to Know Before Heading to Las Vegas, features an interview between TruGrid Senior Director of Marketing Amy Norstedt and RE+ Vice President of Marketing Danielle Danko. Together, they discuss the biggest changes attendees can expect this year, including RE+’s permanent move to November, the return to the Las Vegas Convention Center, how Formula 1 race week will impact travel, new networking opportunities, transportation options, and planning resources available before arriving.

“RE+ is the premier gathering for the renewable energy industry, and this year brings several significant changes that attendees should prepare for,” said Danielle Danko, Vice President of Marketing at RE+. “We wanted to create a resource with TruGrid that answers the questions everyone is asking before they arrive.”

Among the topics covered in the guide are:

Why RE+ has moved from September to NovemberBenefits of the event returning to the Las Vegas Convention CenterWhat attendees should know about Formula 1 race weekChanges to education sessions and expo hall schedulingChanges to the Block Party and networking opportunitiesTransportation tips, including the Vegas Loop and MonorailPlanning tools that can help attendees maximize their time on site

As one of the conference’s largest sponsors, TruGrid will have team members throughout RE+ meeting with developers, owners, investors, and industry partners to discuss their engineering, procurement, and construction (EPC) services for utility-scale battery energy storage system and solar projects.

“The best partnerships begin with meaningful conversations,” said Amy Norstedt, Senior Director of Marketing at TruGrid. “We’re excited to provide RE+ attendees with a resource that helps them navigate this year’s event while creating opportunities to connect with our team. With a 0.00 total recordable incident rate (TRIR) throughout 2025 and year-to-date in 2026, TruGrid remains committed to delivering projects with the highest standards of safety, quality execution, and reliability.”

To read the complete RE+ 26 Survival Guide, visit the TruGrid blog.

Attendees interested in scheduling a meeting with the TruGrid team during RE+ or before the conference begins can email sales@trugridpower.com.

About TruGrid
TruGrid is a premier utility-scale engineering, procurement, and construction (EPC) contractor specializing in battery energy storage systems (BESS) and solar technology. Its mission is to connect customers and communities with reliable and valuable utility-scale clean energy projects. Based in Houston, Texas, TruGrid is at the forefront of North America’s energy transition, offering solutions that ensure the most profitable projects for customers. Proudly owned by Hull Street Energy, TruGrid is dedicated to advancing sustainability and leading the energy industry with a focus on excellence, safety, and reliability.

Contact
Amy Norstedt
Senior Director of Marketing
TruGrid
anorstedt@trugridpower.com

View original content to download multimedia:https://www.prnewswire.com/news-releases/trugrid-and-re-partner-on-exclusive-attendee-guide-ahead-of-re-26-302852475.html

SOURCE TruGrid

Continue Reading

Trending